The BioCat Project focused on demonstrating the technical and economic potential of a cutting-edge energy storage technology known as power-to-gas – this project was successfully completed in December 2016. In addition, Electrochaea continues to maintain and operate the BioCat Plant as a demonstration site, which is open for visitors. Inside the bioreactor, a culture of methanogenic archaea metabolizes the hydrogen and carbon dioxide to methane.
Poroject Lead: Electrochaea
Region: Europe
Country: Denmark
City/Town: Hvidovre
Timeline Start - End: 2014-01-02 - 2016-12-31
Project Status: Completed
Project Budget: 6700000.0 €
Funding source: EUDP 55% ForskEL
Activities:
- CCU (Power-to-X)
CO2 Source: Two sources: raw biogas from adjacent AD (+- 60% CH4, 40% CO2) and a pure CO2 stream from on-site biogas upgrading system
CCU Tecnology Category: Utilization
Info On Utilization:
- Catalytic conversion
- Biological conversion
Facility stage: Operational
End TRL: 7
CO2 capture/Utilization:
Production Volume:
Product Categories:
- Fuels
Specific Product(s): Methane
- Insero
- Neas Energy
- HMN
- Biofos
- Audi
- Hydrogenics
- Electrochaea