BioCat Project

  • Project Description

    The BioCat Project focused on demonstrating the technical and economic potential of a cutting-edge energy storage technology known as power-to-gas – this project was successfully completed in December 2016. In addition, Electrochaea continues to maintain and operate the BioCat Plant as a demonstration site, which is open for visitors. Inside the bioreactor, a culture of methanogenic archaea metabolizes the hydrogen and carbon dioxide to methane.

    Poroject Lead: Electrochaea

  • Geographical Information

    Region: Europe

    Country: Denmark

    City/Town: Hvidovre

  • Project Boundaries

    Timeline Start - End: 2014-01-02 - 2016-12-31

    Project Status: Completed

    Project Budget: 6700000.0 €

    Funding source: EUDP 55% ForskEL

  • Technological Information

    Activities:

    - CCU (Power-to-X)

    CO2 Source: Two sources: raw biogas from adjacent AD (+- 60% CH4, 40% CO2) and a pure CO2 stream from on-site biogas upgrading system

    CCU Tecnology Category: Utilization

    Info On Utilization:

    - Catalytic conversion

    - Biological conversion

    Facility stage: Operational

    End TRL: 7

  • Technological Details

    CO2 capture/Utilization:

    Production Volume:

  • Product Information

    Product Categories:

    - Fuels

    Specific Product(s): Methane

  • Partners

    - Insero

    - Neas Energy

    - HMN

    - Biofos

    - Audi

    - Hydrogenics

    - Electrochaea