Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Back

BioPower2Gas (site 1)

  • Project Description

    The power-to gas combination of electrolysis and biological methanation technology represents an essential component for future energy systems, combining decentralised solutions for storage of energy with upgrading of raw biogas. During this project various power controlled biogas technologies have been analyzed, experienced in practice and compared in terms of their capability to generate electricity demand-actuated. For this, a new “BioPower2Gas”-method (methanation of H2 produced with surplus renewable electricity and CO2 from the biogas plant) was installed by the company MicrobEnergy. This method was successfully tested and due to become practice-approved and was tested by three plants.

    Poroject Lead: IdE Institut dezentrale Energietechnologien GmbH

  • Geographical Information

    Region: Europe

    Country: Germany

    City/Town: Allendorf (eder)

  • Project Boundaries

    Timeline Start - End: 2013-01-09 - 2016-08-31

    Project Status: Completed

    Project Budget: 0.0 €

    Funding source: BMWi and Energetische Biomassennutzung

  • Technological Information

    Activities:

    - CCU (Power-to-X)

    CO2 Source: CO2 from biogas

    CCU Tecnology Category: Utilization

    Info On Utilization:

    - Biological conversion

    Facility stage: Operational

    End TRL: 8

  • Technological Details

    CO2 capture/Utilization:

    Production Volume: Maximum 15 Nm³ biomethane/h.

  • Product Information

    Product Categories:

    - Fuels

    Specific Product(s): Methane

  • Partners

    - MicrobEnergy GmbH

    - CUBE Engineering GmbH

    - EAM EnergiePlus GmbH

    - EnergieNetz Mitte GmbH

    - IdE Institut dezentrale Energietechnologien gemeinnützige GmbH