The power-to gas combination of electrolysis and biological methanation technology represents an essential component for future energy systems, combining decentralised solutions for storage of energy with upgrading of raw biogas. During this project various power controlled biogas technologies have been analyzed, experienced in practice and compared in terms of their capability to generate electricity demand-actuated. For this, a new “BioPower2Gas”-method (methanation of H2 produced with surplus renewable electricity and CO2 from the biogas plant) was installed by the company MicrobEnergy. This method was successfully tested and due to become practice-approved and was tested by three plants.
Poroject Lead: IdE Institut dezentrale Energietechnologien GmbH
Region: Europe
Country: Germany
City/Town: Allendorf (eder)
Timeline Start - End: 2013-01-09 - 2016-08-31
Project Status: Completed
Project Budget: 0.0 €
Funding source: BMWi and Energetische Biomassennutzung
Activities:
- CCU (Power-to-X)
CO2 Source: CO2 from biogas
CCU Tecnology Category: Utilization
Info On Utilization:
- Biological conversion
Facility stage: Operational
End TRL: 8
CO2 capture/Utilization:
Production Volume: Maximum 15 Nm³ biomethane/h.
Product Categories:
- Fuels
Specific Product(s): Methane
- MicrobEnergy GmbH
- CUBE Engineering GmbH
- EAM EnergiePlus GmbH
- EnergieNetz Mitte GmbH
- IdE Institut dezentrale Energietechnologien gemeinnützige GmbH