For this project, a Power-to-Gas facility would produce carbon-neutral synthetic biogas using carbon dioxide emissions and electricity generated at the waste-to-energy plant. The purpose of the joint study is to confirm the optimal size of the project, the cost of synthetic biogas for district heating, and to understand the boundary conditions for project feasibility. Once feasible, the parties intend to continue joint development of the project towards a commercial-scale pilot project. Synthetic biogas would replace the use of conventional natural gas in district heating, thereby reducing Vantaa Energy’s carbon dioxide emissions.
Poroject Lead: Vantaa Energy
Region: Europe
Country: Finland
City/Town: Vantaa
Timeline Start - End: 2022-10-07 -
Project Status: Ongoing
Project Budget: 30000000.0 €
Funding source: NextGeneration EU
Activities:
- CCU (Power-to-X)
- Applicability assessment
CO2 Source: Waste-to-energy plant
CCU Tecnology Category: Utilization
Info On Utilization:
- Chemical conversion
Facility stage: Planning
End TRL: 8
CO2 capture/Utilization:
Production Volume: 80000 MWh/a synthetic methane
Product Categories:
- Fuels
Specific Product(s): Synthetic methane
- Vantaa Energy
- Vantaa Energy Ltd.
- Wärtsilä