Liquid Wind's second facility is being designed in cooperation with the energy company Sundsvall Energi and will be located on the Korstaverket site in Sundsvall, close to the Tunadal harbour. The facility will capture carbon dioxide from the Korsta plant, and the biogenic part of the captured carbon dioxide will be used to produce e-fuel for shipping as a substitute for fossil fuels
Poroject Lead: Liquid Wind
Region: Europe
Country: Sweden
City/Town: Sundsvall
Timeline Start - End: -
Project Status: Upcoming
Project Budget: €
Funding source:
Website: https://www.liquidwind.se/facilities
Activities:
- CCU
CO2 Source: WtE
CCU Tecnology Category: Capture (Point sources) and Utilization
Info On Utilization:
- Catalytic conversion
Facility stage: Planning
End TRL: 8
CO2 capture/Utilization:
Production Volume:
Product Categories:
- Fuels
Specific Product(s): methanol
- Sundsvall Energi