The Jupiter 1000 project is the first industrial demonstrator of Power to Gas with a power rating of 1 MWe for electrolysis and a methanation process with carbon capture. Green hydrogen will be produced using two technologies of electrolysers (500kW Alkaline and 500kW PEM) fed by 100% of renewable energy. The installation will be based on an innovative methanation technology (H2 fed by one electrolyser of 500kW) and CO2 will be captured on a nearby industrial site. In the light of the performance levels shown by the demonstrator, GRTgaz and its partners will work on future technical and economic standards of a full-sized installation of this type. Over the longer term, the idea is to launch the Power to Gas activity in France. Between 20 and 50 TWh of electricity could converted into gas per year could be produced each year using the Power to Gas system by 2050.
Poroject Lead: GRTgaz
Region: Europe
Country: France
City/Town: Fos-sur-mer
Timeline Start - End: 2016-03-01 - 2021-03-01
Project Status: Completed
Project Budget: 30000000.0 €
Funding source: French Public & private funding
Website: https://www.jupiter1000.eu/english
Activities:
- Research (Hydrogen production)
- Research (CCU)
- CCU (Power-to-X)
CO2 Source: Not specified (neighbouring industrial companies)
CCU Tecnology Category: Capture (Point sources) and Utilization
Info On Utilization:
- Thermal conversion
- Chemical conversion
Facility stage: Commissioning
End TRL: 6
CO2 capture/Utilization: 25Nm3/h
Production Volume: 25Nm3/h
Product Categories:
- Fuels
Specific Product(s): H2 and Methane. Injection of both gases will be conducted.
- CEA
- Khimod Alcen
- McPhy Energy
- Port Marseille Fos
- Leroux & Lotz
- CNR
- GRT Gaz
- ATMOSTAT
- TEREGA
- RTE