Project Breogan is designed to produce 20,000 tonnes/year of synthetic crude, requiring 70,000 tonnes/year of biogenic CO2 captured from Greenalia's biogenic feedstock-based production facility. This innovative approach will reduce greenhouse gas emissions by up to 95%. By integrating biogenic carbon and green hydrogen from renewable sources, the project paves the way to gradually replace conventional fossil crudes in key sectors.
Poroject Lead: P2X Europe
Region: Europe
Country: Spain
City/Town: Curtis-Teixeiro
Timeline Start - End: 2023-05-01 -
Project Status: Ongoing
Project Budget: €
Funding source:
Activities:
- CCU
CO2 Source: Biomass power plant
CCU Tecnology Category: Capture (Point sources) and Utilization
Info On Utilization:
- Fischer-Tropsch synthesis
- Syngas production
Facility stage: Planning
End TRL: 8
CO2 capture/Utilization:
Production Volume: 20000 t/a synthetic hydrocarbons
Product Categories:
- Chemicals, Fuels
Specific Product(s): synthetic hydrocarbons, e-diesel, e-waxes, SAF, avaiation fuels